-
Notifications
You must be signed in to change notification settings - Fork 24
Open
Labels
Description
The analysis of a project can be configured in several different ways and we should consider some of the following ideas:
-
Analysis schedule: users should be able to configure a project to only be analyzed at a certain interval, for example a month.
-
Default analysis interval: the default interval for analyzing a project can, for example, be set to the last two weeks as most users wouldn't want to analyze in the entire lifetime of a project.
-
Users should be able to reset the result of an analysis (maybe even per commit) and run it again with a different configuration.